Projects

CONTINENTAL TIRE PLANT – CLINTON, MS
June 4, 2018: Continental Tire, Brasfield and Gorrie (GC), and Barge
Design (structural engineer) chose for PSCS to furnish the following products
at their new USD $1.4 billion tire plant in...
Read more

STRAIGHT HC-OMEGA USED ON PROLOGIS’ CLUB CAR PROJECT IN APPLING, GA
April 26, 2018: The world's largest logistics warehouse developer, Prologis,
selected the Straight HC-Omega armored joint to be used in conjunction with Ductilcrete's
wide joint slab system at...
Read more

STRAIGHT HC-OMEGA ARMORED JOINT USED ON RECORD BREAKING MEGA SLAB POUR AT GENERAL MOTORS
January 30, 2018: On the evening of January 13, 2018, the MegaSlab pour began at
General Motors Arlington, TX assembly plant. This was a continuous, non-stop
pour that in total was, 6,470 cubic...
Read more
Clients
































